Construction of over 200,000 square feet, and twelve buildings consisting of 144 four bedroom two bath apartments along with a recreational clubhouse.
ABM Mechanical’s responsibility was the complete design and construction of the heating ventilation, cooling, and plumbing systems for the complex long with the specification of the sprinkler system.
Project Team
ABM Mechanical, Inc. – Performed all the mechanical contract requirements. Pizzagalli Construction – Performed the general contractor responsibilities. Twin City Sheet Metal – Performed the sheet metal and breeching fabrication and labor. Damon Insulation – Provided insulation services. ABM Mechanical, Inc. – Performed automatic temperature control services.